Full tear-off to deck
Old covering, underlayment and nails come off down to the sheathing. We inspect every sheet for rot and delamination and replace what is soft before anything new goes down.
Whole San Antonio subdivisions age together, so whole subdivisions need new roofs together. Stone Oak homes built around 2000, Sonterra homes from 1999 to 2005, Alamo Ranch homes from 2005 to 2015 and Thousand Oaks homes from the mid-1980s are all on different points of the same clock. A replacement here starts with a full tear-off to the deck and an honest look at what is underneath, not a patch on a roof that is done.

Roof replacement is a full tear-off and rebuild of your roof system, not a layover. We strip the old covering down to the deck, replace any soft or delaminated sheathing, then rebuild from the bottom up: underlayment across the field, self-adhering membrane in the valleys, new drip edge and flashing, and ridge ventilation sized to your attic. Only then does the new surface go down.
The city's housing stock makes the timing predictable. San Antonio's median year built is 1985 and Bexar County's is 1990, so half the county's homes are at least 36 years old in 2026. An architectural shingle roof realistically lasts 15 to 20 years in this heat, which puts many 1990s homes on a second or third roof. If your shingles are curling, granules are pooling in the gutters, or you have had two leak repairs in a year, call (254) 329-0299 and we will tell you straight whether repair or replacement is the honest answer.
Every full roof replacement we sell is a complete system install, not just shingles. The list below is standard on our written scope, so you can see exactly what is included before you sign anything.
Old covering, underlayment and nails come off down to the sheathing. We inspect every sheet for rot and delamination and replace what is soft before anything new goes down.
Synthetic underlayment goes across the field, self-adhering membrane in the valleys and along the eaves. That is the layer that actually keeps water out when a shingle fails.
A replacement gets new step flashing at the walls, new pipe boots at penetrations, and new drip edge around the perimeter. Old flashing is where most leaks start — we do not reuse it.
A ridge vent sized to the roof area paired with soffit intake. Proper attic ventilation is what keeps a San Antonio roof from cooking itself from underneath.
We prepare the City of San Antonio re-roof paperwork and the job ends with the City's final building inspection. You get the signed-off documentation for your records and for resale.
A magnetic sweep of the lawn and driveway after the job, gutters cleared, and debris hauled away. We finish by walking the yard with you, so you can see the cleanup for yourself before we leave.
We walk the roof, check the deck from the attic side with a moisture meter and photograph every soft spot, cracked flashing boot and hail bruise. You get a written scope with measurements and material options.
Shingles, underlayment and coil stock land the morning of the job. We protect the landscaping, set fall protection anchors and arrange for debris to be hauled away without blocking your driveway.
The old roof comes off and we magnetic-sweep the yard for nails after the tear-off. Any rotten sheathing gets cut out and replaced on the spot. We do not shingle over soft deck, ever.
Self-adhering membrane goes in the valleys and along the eaves, then synthetic underlayment across the field. New drip edge, step flashing and pipe boots go on before the first course of the new surface.
The roof is cleared and the gutters swept, the magnetic sweeper is run across the lawn and driveway, and debris hauled away. Then the finished roof is walked with you, flashing details shown.
We walk the roof, check the deck from the attic side with a moisture meter and photograph every soft spot, cracked flashing boot and hail bruise. You get a written scope with measurements and material options.
Sets each fastener to the depth and pattern the manufacturer specifies on a replacement. Placement is hand-checked on every course, because an over-driven nail tears the shingle it was meant to hold.
Trims the valleys, hips and rake edges by hand on a replacement. Clean hand-cut details are what make a finished roof look finished instead of rushed.
Tear-off and detail work on a replacement. The pry bar lifts old shingles without damaging sound decking, and the knife cuts underlayment and membrane to fit.
Marks straight reference lines before the first course goes down. A replacement lives or dies on its layout, and straight courses are how you can tell the crew laid it to spec.
Fall protection on every pitch through the whole tear-off. Nobody goes on a roof without it, and no ladder goes on a slope it cannot handle.
Checks the attic side for wet decking and hidden leaks. The meter shows moisture without tearing anything open, so soft sheets are replaced instead of roofed over.
A home still on its original architectural shingles can show granule loss in the gutters, curling on the south slope and leaks over the master bedroom.
What we do: full tear-off to the deck, soft sheets replaced, new underlayment and valley membrane, new flashing and ridge ventilation, and a new architectural shingle system installed to the manufacturer's pattern.
Book this service →
A ranch on a roof well past its realistic 15 to 20 year life, with brittle shingles and a sagging valley, is ready for a rebuild.
What we do: tear-off down to the deck, deck repairs in the valley, and a complete rebuild with new flashing throughout, so the next roof starts from a sound base instead of a tired one.
Book this service →A home from the 2005 to 2015 build wave can have curling builder-grade shingles and a ceiling stain in the hallway after a wind event.
What we do: an honest repair-versus-replace read first, then a full replacement with impact-rated architectural shingles, new drip edge, flashing and ridge vent, with the permit paperwork prepared.
Book this service →Most replacement decisions announce themselves long before the ceiling stains: granule loss across the field, curling on the south and west slopes, a deck that has gone soft underfoot. Here are the problems that point to replacement, and what happens if they are ignored.
Ask a pro →We inspect the deck from the attic side, document granule loss and shingle condition, and quote a full replacement with architectural shingles suited to this climate. No layover, no patch on a roof at end of life.
We photograph and document hail damage slope by slope so you have a written record. That record is yours to give your insurer; we do not file or negotiate the claim for you.
Every replacement includes new step flashing, pipe boots and drip edge. We do not reuse old flashing, because that is exactly where the next leak starts.
San Antonio allows a maximum of two roof layers, and a roof already carrying two can only be torn off to the deck. We count the layers before we quote, so the layer count is settled before work starts.
“Found their ad on marketplace, super quick feed back. Gentlemen stopped by same day to inspect roof. This company is extremely professional and quick. They had our roof done in 2 days. Great price point and easy to work with. Thank you Juarez Contracting.”
Alethia VelazquezGoogle review
“Chris was professional, on time for the estimate, very informative about what needed to be done,and willing to work with me. Thank you for a job well done.”
Belinda SalinasGoogle review
“Very fast estimate and fixed within 24 hours of asking them for help. Very fast and very reliable. My roof looks great!”
Jamie KGoogle review
Age and deck condition decide it. An architectural shingle roof realistically lasts 15 to 20 years in San Antonio heat. If the roof is past that, granules are pooling in the gutters, or you have had two leak repairs in a year, replacement is usually the honest answer. A younger roof with one failed flashing or a few missing shingles is usually a repair.
Yes. Any roof replaced or installed inside San Antonio city limits needs a City re-roof permit. The flat fee is $28.75, which comes to $31.05 with the City's two 4% surcharges for an online filing. A maximum of two roof layers is allowed, and a pitch change needs full plan review.
A standard single-story home is usually a one- to two-day job. Two-story homes, steep pitches and tile roofs run longer. If we find significant deck rot or the weather turns, we tell you the revised window the same day.
A lot. Stone Oak homes built around 2000, Sonterra homes from 1999 to 2005, Alamo Ranch homes from 2005 to 2015 and Thousand Oaks homes from the mid-1980s are all on different points of the same roof-age clock. If your neighbours are replacing roofs, yours is probably on the same schedule.
One inspection, a written scope with real detail, and a crew that shows up when we say we will. Call (254) 329-0299 during business hours or request an inspection online.
Call (254) 329-0299 →Call us at (254) 329-0299 or send an email. We answer the phone during business hours and return after-hours messages first thing the next business morning. Inspections are by appointment and there is no obligation.